Your location: Home > The ball mill installation test run
News

The ball mill installation test run

Date: 2014-7-29 18:16:55 Read: 3157 times

Commissioning: 
Ball mill installation is complete, after inspection, the empty test run can be achieved. The ball mill of ball mill in the test run by skilled operators, ball mill and strictly abide by the safety operation procedures. 
(a) continuous operation of idle running time not less than 12-24 hours a day, found that the problem should be resolved in a timely manner during operation. 
(2) the idle running of commissioning can be normal load test run. The load test run in every phases. Load operation shall be carried out according to the condition of discharge in the feed, avoid unnecessary grinding ball and the cylinder liner and damage. 
1, add appropriate material, and a third the number of steel ball (see the largest amount with ball mill assembly drawing) test run 12 to 24 hours. 
2, join to two-thirds of the number of steel ball works 24 to 48 hours. 
3, according to the ball mill discharge conditions, production of qualified products, with reference to the same kind of ball-mill machine actual loading quantity, determine the ball loading quantity of the ball mill machine, step to less than 72 hours of test run. 
(3) the increase of the load and test run of the length of time, with the size of the gear and gear reducer of the running-in condition (temperature, noise, tooth contact, etc.) as a basis for sure. In front of the tooth surface contact precision did not meet the design requirements, shall not operate at full capacity. (4) commissioning of cooling and lubrication system should be working properly. Main bearing, bearing, reducer temperature should be normal. 
(5) into the two-thirds of the number of steel ball test run 24-48 hours later, should check and tighten all bolts again. 
(6) the commissioning work should earnestly each record. 
CATEGORY
PRODUCTS
主站蜘蛛池模板: 日本按摩xxxxx高清| 三级网站免费| 久久久久国产精品免费网站| 成人国产精品视频频| 中文字幕免费观看视频| 天天综合网站| 日本一区二区免费看| 美女久久久久久久久久久 | 国产精品999| 99爱视频精品免视看| 一级久久| 婷婷色在线| 日韩精品视频在线观看免费| 欧美大成色www永久网站婷| 久操资源在线| 国产精品爽爽va在线观看无码| 99九九99九九九视频精品| 国产三级一区二区| 午夜wwww| 欧美大成色www永久网站婷| 黄色一级视频网| 福利在线网址| 91天堂在线| 亚洲午夜在线| 四虎免费在线观看| 热久久亚洲| 免费的黄网| 九九精品免视频国产成人| 国产成人精品影视| 日韩日b视频| 欧美成网站| 久久久xxxx| 韩国三级日本三级美三级| 成人在线激情视频| 99re在线播放视频| 伊人小视频| 亚洲va高清中文字幕| 日日噜噜噜夜夜爽爽狠狠视频| 欧美色网络| 免费狼人久久香蕉网| 久久久精品国产|